Visual Studio 2013 is Ultimate with Update 5 takes only 5GB? In the past, each newer Update added about 1 GB to the size of the ISO image file. We are here to announce the availability of the visual studio 2013 — the team foundation server 2103 release five updates for manufacturing RTM.
This update is latest in the cumulative series for the improvement of the technology and Bug fixes for visual studio 2013 periods updates enable to enhance both visual studio and team foundation server which support the latest development for building and managing apps.
Visual Studio 2013 provides the current update for visual studio 2013 RTM released in November 2103. This only support after the release of the current update.
Visual Studio 2013 provides the current update for visual studio 2013 RTM service pack. This version visual studio 2013 RTM released in November 2013. This only support after that release of the current update.
Mainly the tools release for Android cordon which is incompatible with five updates. If you have installed tools for Apache cordon CPT extension, then uninstall the extension before installing visual studio 2013.
Visual Studio 2013 update.
Cloud-based load testing from Azure data center worldwide.
The infrastructure required some setting to run load testing by using visual studio team foundation just for more comfortable services. You may perform the cloud-based testing to support Azure data center move around the world.
You may also run quarries in visual studio with current iteration token on the visual studio team foundation server 2015 or visual studio team online.
We have included a lot of ability for a local update for local workspace. This performs check-in automatically correct the mapping workspace for using the new team project.